This is one of the most widely asked questions in Supply Chain Management. The difference between effective capacity and actual capacity;
Effective capacity:
Effective capacity is the maximum rate of output that can be achieved under operating constraints.
Always lower than design capacity.
Actual capacity:
The maximum output rate is actually achieved under the constraints of machine breakdowns, labor inefficiencies, and absenteeism.
Always lower than effective capacity.